How far is R Mall from Piramal Revanta?

The distance between the popular R Mall and Piramal Revanta property in Mumbai is only 3 km (about 10 min. drive)

When will the sonapur metro station be operational?

The Mumbai metro line 4 (with the proposed Sonapur metro station) is slated to be operational by 2025 year end.

How long is the Eastern Express Highway from Piramal Revanta?

The distance between Eastern Express Highway and Piramal Revanta is less than 3 km.

Possession dates of which Piramal Revanta towers are the closest from now?

The possession dates of Piramal Revanta towers from now:
Tower 3 (Ravin) - Dec 2025
Tower 4 (Ravisa) - Mar 2026
Tower 5 (Raynav) – Nov 2028
Tower 6 (Rayansh) – July 2030

What is the flat configuration in the latest Piramal Revanta tower?

The last and the tallest highrise in Piramal Revanta, Rayansh (48 storeys, coming up soon) will have premium residences spanning across 2 bhk, 2 bhk + study, and 3 bhk.